Документ взят из кэша поисковой машины. Адрес оригинального документа : http://www.mcc.rsa.ru/www_old/Mir/www_eng/MIR/BNO/Arhiv/Inform_press2202.htm
Дата изменения: Wed May 28 21:15:02 2014
Дата индексирования: Sun Apr 10 03:00:20 2016
Кодировка:

Поисковые слова: annular solar eclipse
Press release

Press release 

 22.02.2001

Press release 

February 22 2001 09:00 (Moscow time)

   
      The station "Mir" and cargo vehicle «Progress л 1-5» operations scheduled for 21-22 February completed.

        The onboard "Mir" and the cargo ship systems checked out, orbit radiomonitoring performed. The spinning rate of the Station was corrected to stabilize power generation.

        The Station remains pressurized, the onboard systems perform nominal. The Station keeps in a spinning mode with the MCS in free drift.
       
       The Station and the cargo ship onboard systems further checkout and the orbit radiomonotoring are scheduled for 22-23 Feb.