Документ взят из кэша поисковой машины. Адрес оригинального документа : http://www.apo.nmsu.edu/Site/SDSS.progress/preprot0108/rotat0108.html
Дата изменения: Fri Jan 8 22:48:02 1999
Дата индексирования: Sun Apr 10 01:29:26 2016
Кодировка:

Поисковые слова: http www.badastronomy.com phpbb index.php
SDSS Projects

Rotator Preparation; January 1-5, 1999

Caption above photo

The rotator is uncrated.

Preparations are made for mounting. French Leger and Larry Carry/UW discuss requirements.

Steve B. and Larry Fiscelli help.

The rotator is covered and waiting. The M1 is to be taken to the enclosure Monday and installed. The rotator will be installed after that.

Photos taken by Gretchen Van Doren/APO.