SDSS Projects

M1 Re-installation: January 14, 1999

Captins above photographs

French Leger and Larry Carry (both UW), supported by Mark Klaene, Ron Yarger, and Jon Davis (all from APO), as well as Steve Bastian/FNL, are the support crew for re-installing the M1 into the 2.5m mirror cell.

The group takes a final look at the lifting collar and hoist shackles before lifting the mirror.

The mirror is hoisted over the mirror cell.

The mirror is lowered into the cell.

The mirror has been on the PMSS for two days and appears to be operating correctly. The rotator should be installed on Wednesday, 1/20.

Photos taken by Gretchen Van Doren/APO.