Re: LBA schedule version 1.0

From: <Chris.Phillips_at_email.protected>
Date: Mon, 16 Oct 2006 09:55:16 +1000 (EST)

Jim,

I would like at least half the current gaps for evlbi testing. I will send
you the prefered times soon (pretty much all the non-graveyard shifts).

Cheers
Chris

On Mon, 16 Oct 2006, Jim Lovell wrote:

>Hi everyone,
>
>Attached is a draft LBA schedule for your comments. Please let me know if
>this is going to cause any problems, e.g receiver changes at Parkes,
>especially as there are a lot of band changes. Some notes:
>
>1. Note the 1cm experiment at the end. OK with everyone?
>2. v192a will record for 12 h of the allocated 24 with recording
>times still to be determined.
>3. As v192a requires a single baseline only, v131be will happen in
>parallel. See the text version of the schedule for times/frequencies etc.
>4. I haven't put in any test experiments yet but will fill the gaps
>with these once the other allocations are finalised. However if anyone would
>like some test time in the existing gaps, please let me know.
>
>Comments by Wednesday please!
>
>Thanks,
>Jim
>
>--
>Dr Jim Lovell, Jim.Lovell_at_csiro.<!--nospam-->au
>CSIRO Australia Telescope National Facility Ph: (02) 6125 6715
>c/o RSAA, Mt Stromlo Observatory, Fax: (02) 6125 0260
>Cotter Road, Weston ACT 2611
>Australia http://www.atnf.csiro.au/people/Jim.Lovell
>At Tidbinbilla Ph (02) 6201 7842 (RA Lab), x7800 (switch), x7940(shift)
>
>
>
Received on 2006-10-16 09:55:30