| Документ взят из кэша поисковой машины. Адрес
оригинального документа
: http://www.cosmos.ru/vprokhor/intmins/shift.htm Дата изменения: Tue Apr 20 10:05:46 1999 Дата индексирования: Tue Oct 2 06:37:34 2012 Кодировка: Поисковые слова: rainbow | 
| 
 
 | The INTMINS April 1999 operations
schedule was done on the base of the MIR ground track long-term
prediction using the MIR's orbital elements status on 29/03/99.
 | 
The investigation of the time shift behaviour was began before 29/03/99 on the base of the different orbital elements determined (by KIAM RAN) 22/03/99, 25/03/99 and continued on the base of the orbital elements determined at 31/03/99, 5/04/99.
 Back to the Space Research Institute (IKI) site
Back to the Space Research Institute (IKI) site 
 Back to the IKI
Satellite situation center (SSC) site
Back to the IKI
Satellite situation center (SSC) site