Документ взят из кэша поисковой машины. Адрес оригинального документа : http://www.mcc.rsa.ru/www_old/Mir/www_eng/MIR/BNO/Arhiv/Inform_press0802.htm
Дата изменения: Wed May 28 21:15:02 2014
Дата индексирования: Sun Apr 10 02:58:45 2016
Кодировка:

Поисковые слова: annular solar eclipse
Press release

Press release 

 08.02.2001.

Press release for Feb. 8, 2001 09.00 a.m. (Moscow time)

The Station "Mir" and cargo ship "Progress M1-5"operations scheduled for 7-8 Feb. completed.

The Station and the cargo ship onboard systems checked out, the orbit radio monitoring performed. The cargo ship floating batteries recharged.

The Station remains pressurized, the onboard systems perform nominal. The Station is in spinning mode with the MCS (motion control system) in free drift.

Next checkout of the Station and the cargo vehicle onboard systems is scheduled for 8-9 Feb.