Документ взят из кэша поисковой машины. Адрес
оригинального документа
: http://www.naic.edu/~phil/hardware/galfa/cablsw_jul05.html
Дата изменения: Thu Mar 27 23:51:06 2008 Дата индексирования: Sun Apr 13 01:44:50 2008 Кодировка: Поисковые слова: http astrokuban.info astrokuban |
The cables for pixel4a and pixel6a (count from 0) from the distribution amplifiers in the receiver room to the galfa spectrometer were switched on 11jul05 (after 8 am AST). They were returned to the normal order on 19jul05 (12:00 AST). The data going to the wapps were never switched. This meant that when looking at the galfa data off line:
Continuum sources drift/move through the alfa beams at different times since the beams point at different locations in the sky. 600 second total power scans showed that pixel 6a and pixel 4b had continuum sources moving through the beams at the same time (6b and 4a also showed this).
On 11jul05 a2011 took data using the wapps and using
galfa. The plot shows the total
power drifts versus time after the cable switch (.ps) (.pdf).
Each pixel is plotted in a different color.