Документ взят из кэша поисковой машины. Адрес оригинального документа : http://www.stsci.edu/ftp/observing/status_reports/old_reports_96/hst_status_06_20_96
Дата изменения: Thu Jun 20 14:34:02 1996
Дата индексирования: Sun Dec 23 10:44:40 2007
Кодировка:

Поисковые слова: moon
HUBBLE SPACE TELESCOPE

DAILY REPORT #1659

PERIOD COVERED: 0000Z (UTC) 06/19/96 - 0000Z (UTC) 06/20/96

Daily Status Report as of 172/0000Z

1.0 ACTIVITIES SCHEDULED AND ACCOMPLISHED:

1.1 Completed GHRS/1 6027 (HST-Galileo Torus Observations)

The High Resolution Spectrograph (Side One) was used to make =
observations of the plasma torus which is formed by Jupiter's moon Io. =
These observations were in coordination with the Galileo and EUVE =
spacecraft, and ground based observations. These data will provide three =
dimensional information on the torus and give insight into the process =
that determines the shape of the torus and the mechanism for the entry =
and transport of material. The observations were executed as scheduled, =
and no anomalies were noted.

1.2 Completed WF/PC-2 6346 (Snapshot Survey of the Ultraluminous IRAS =
Galaxy Sample-Part 1 High)

The WF/PC-2 was used to make snapshot survey observations of the =
ultraluminous IRAS galaxy QDOTULIR. These data will be searched for =
multiple cores, which imply a merger has occurred, and for starburst =
regions. The observations were executed as scheduled, and no anomalies =
were noted.

1.3 Completed FGS/WF/PC-2 6062 (HD98800, An Extraordinary Star)

The WF/PC-2 and the FGSs were used to observe HD98800, a nearby =
multiple star with strong infrared emission. The infrared emission =
presumably comes from a thick disc around the system. The proposal will =
measure the strength of the Mg II line at 2800A, and will address the =
fundamental questions about disk formation, maintenance, and dynamics. =
Several other reference stars were also observed. The observations were =
executed as scheduled, and no anomalies were noted.

2.0 FLIGHT OPERATIONS SUMMARY:

2.1 Guide Star Acquisitions:

Scheduled Acquisitions : 7
Successful : 7

Scheduled Reacquisitions : 8
Successful : 8

2.2 FHST Updates:

Scheduled : 18
Successful : 18

2.3 Operations Notes:

Flight operations personnel returned to the MOR area from the SAMS =
backup facility at 171/2111Z.

3.0 SIGNIFICANT FORTHCOMING EVENTS:

Nothing at this time.

/DMH