Документ взят из кэша поисковой машины. Адрес оригинального документа : http://www.stsci.edu/hst/hst/proposing/documents/cp/3_Proposal_Categories09.html
Дата изменения: Unknown
Дата индексирования: Tue Apr 12 04:05:24 2016
Кодировка:
HST Call for Proposals
HST Call for Proposals and HST Primer for Cycle 24
help@stsci.edu
Table of Contents Previous Next Print


Hubble Space Telescope Call for Proposals for Cycle 24 > Chapter 3: Proposal Categories > 3.8 Joint HST-NOAO Observing Proposals

3.8
By agreement with the National Optical Astronomy Observatory (NOAO), STScI will be able to award time on NOAO facilities to highly ranked proposals that request time on both HST and NOAO telescopes. The award of time on NOAO facilities will be subject to approval by the NOAO Director, after nominal review by the NOAO TAC to avoid duplication of programs. The important additional criterion for the award of NOAO time is that both the HST and the ground-based data are required to meet the science goals of the project. It is not essential that the project requires simultaneous NOAO and HST observations. Under this agreement, NOAO time will only be awarded in conjunction with new HST observations (and should not be proposed for in conjunction with an AR or Theory Proposal). Major results from these programs would be credited to NOAO and HST.
NOAO has offered up to 5% of its available time to proposals meeting the stated criteria. NOAO observing time will be implemented during the two 2017 NOAO observing semesters (2017A for February to July 2017 observations, and 2017B for August 2017 to January 2018 observations). Time cannot be requested for the preceding semester, 2016B. Time may be requested only for those facilities listed on the NOAO/NASA Collaboration webpage. Under this agreement approximately 15-20 nights per telescope per year will be available on most (but not all) NOAO telescopes. Only a fraction of the time is available on some facilities - the WIYN and SMARTS telescopes - and so the 5% cap applies only to this fraction. In addition, time on heavily-subscribed resources may be limited by the NOAO Director.
Establishing the technical feasibility of the proposed NOAO observations is the responsibility of the PI, who should review the NOAO documentation or consult with NOAO directly. A description of the technical information that should be included in the proposal is given in Section 9.4.4. If approved for NOAO time, the PI must submit, by September 30, 2016, an NOAO Phase II form giving detailed observing information appropriate to the particular NOAO telescope and instrument. In addition, for NOAO time on Gemini, successful PIs will be required to submit a complete NOAO proposal by September 30, 2016 on the standard NOAO proposal form. This will be reviewed by the regular NOAO TAC to determine the Gemini queue in which the observations will be placed.
NOAO will perform feasibility checks, and reserves the right to reject any approved observation determined to be infeasible, impossible to schedule, and/or dangerous to the telescopes or instruments. Any NOAO observations that prove infeasible or impossible could jeopardize the overall science program and may cause revocation of the corresponding HST time allocation.
Joint HST-NOAO Proposals must be identified in the ‘Special Proposal Types’ section of the proposal (see Section 8.10). Also, you must include technical information about the NOAO observations in the ‘Coordinated Observations’ section of the proposal (see Section 9.4.4).

Hubble Space Telescope Call for Proposals for Cycle 24 > Chapter 3: Proposal Categories > 3.8 Joint HST-NOAO Observing Proposals

Table of Contents Previous Next Print