Документ взят из кэша поисковой машины. Адрес оригинального документа : http://www.stsci.edu/hst/wfpc2/documents/tir/tir9701.html
Дата изменения: Unknown
Дата индексирования: Mon Apr 11 10:47:09 2016
Кодировка:
WFPC2 TIR Abstract
STScI Logo

Hubble Space Telescope
WFPC2 TIR Abstract

WFPC2 Technical Instrument Report 97-01:

Results of the WFPC2 SMOV Relative Photometry Check

-Whitmore, Gonzaga, and Heyer

The photometric throughput of the WFPC2 was essentially unaffected by the 1997 servicing mission. The mean change in throughput is observed/predicted = 0.9984+/-0.0023. The largest deviation is a decline of 0.4+/-0.2% in the PC1. Even this should be considered tentative until new observations become available during the next few months, since it represents only a 2-sigma deviation.

The Complete Paper (PDF 0.83 MB) is available, or contact: help@stsci.edu.