Документ взят из кэша поисковой машины. Адрес оригинального документа : http://www.stsci.edu/institute/stuc/october-07/Science_Policies.pdf
Дата изменения: Thu Dec 6 19:04:17 2007
Дата индексирования: Sat Dec 22 18:55:11 2007
Кодировка:

Поисковые слова: moon
Science Policies Update
STUC Meeting 18 October 2007

1


Outline
Cycle 17 schedule WFC3 ERS program Multi-cycle proposals HST Lunar Initiative

STUC Meeting October 18 2007

2


Cycle 17 schedule

SM4 is scheduled for August 7 2008
SM4 complete by late August 2008 SMOV during September/October 2008 HST available for observations ~November 2008

Cycle 17 will start immediate after SM4
Avoid multiple instrument suites during a cycle WFPC2 programs will either be completed in Cycle 16, or switched entirely to WFC3 in Cycle 17

Cycle 17 schedule
CP17 release ­ 3 December 2007 Proposal deadline ­ 7 March 2008 (2 weeks before Chandra) HST TAC meets @ STScI/JHU ­ May 12-16 2008 Phase II reviews ­ July/August 2008 (pre-SM4) Cycle 17 ends December 31 2009

STUC Meeting October 18 2007

3


Cycle 17 TAC

Cycle 17 will offer a broad instrumental suite
WFC3, COS, ACS (all cameras), STIS, NICMOS, FGS Spectroscopy will become possible again with HST

We anticipate a substantial rise in the number of proposals ­ perhaps >1200 We are taking several steps to deal with this:
Add extra panel by combing Solar System with Exoplanets, Circumstellar Material and Star Formation mirror panels for Solar system programs for the first time (12 panels in total) 1 extra week for panelists reviews Panelists asked to provide preliminary grades for 2/3rds proposals

Contingencies
ACS & STIS repairs are on best effort basis; proposals to use either as prime will be disallowed if the repairs are unsuccessful, and replaced with highly-ranked programs using available instruments Proposals to use WFC3 and ACS in parallel must provide contingency plans for non-availability of ACS TAC/panels will advise on ranking HST TAC/panels will be asked to rank deeper than normal
STUC Meeting October 18 2007

4


WFPC2 issues
WFPC2 will WFPC2 Moving be replaced by WFC3 during SM4 observations can be completed by the original SM4 date (9/08) to August will leave some programs incomplete
GO 11101 11129 11134 11177 11196 11203 11207 11221 11227
*

· 10 GO programs are affected
Two should be ~90% complete, and will be terminated (subject to appeal to TTRB) Four are <90% complete, and will be transferred to WFC3 Three will be transferred completely to WFC3

PI Canalizo Held Knierman Gronwall Evans Luhman O'Connell Dalcanton Liu

Ntot 66 35 21 24 81 32 24 18 26

Nunex 15 13 2 24 6* 27 24 18 3

· 2-3 Chandra proposals may also be affected

Evans proposal will have unexecuted ACS/SBC 5

STUC Meeting October 18 2007


GO Survey Programs
Survey programs are designed for statistical projects that require observations of N targets, but don't require observations of any particular target SNAP programs with guaranteed observations PIs submit a superset of M targets, 1.5 N < M < 3N STScI will select targets as part of the normal planning process Survey targets must cover at least 12 hours in Right Ascension Maximises scheduling opportunities heduling Survey observations have no orientation or time constraints Survey observations are limited to durations less than 48 minutes/orbit 48 Allows increased flexibility for scheduling in SAA-impacted orbits Combined with absence of constraints, should lead to a larger number of orbits available for GO programs

STUC Meeting October 18 2007

6


GO Survey Programs (2)
Survey program characteristics:
Can request multi-orbit visits for individual targets Tailor individual visits (integration time, filters) for particular targets Can request Moving Targets, if the scheduling windows are >1 month Cannot be prioritised Cannot request time in future cycles

Survey programs are awarded an additional subsidy in the panel time allocation process:
Sliding scale for subsidies for medium proposals (to minimise pain to panels) Survey proposals were granted an additional 15% (reflecting the anticipated gains in scheduling efficiency)

STUC Meeting October 18 2007

7


Cycle 16 results & Cycle 17 strategy
No Survey programs were awarded time
29 proposals submitted, 16 met Survey criteria One Survey program was converted to SNAP program Feedback from users indicated some confusion as to the purpose (and characteristics) of Survey programs

Cycle 17 strategy
Survey programs may be less attractive in 3-gyro mode fewer multiorbit holes in the schedule, but... Survey program category will remain available in Cycle 17 Call for Proposals and Survey UIR updated to take account of uder feedback We will offer an increased subsidy (20%) to panels

STUC Meeting October 18 2007

8


WFC3 Early Release Science Program

9


WFC3 ERS parameters
Director's Discretionary allocated to the WFC3 SOC
1.

Thematic science program designed to provide a thorough test of WFC3 capabilities
"Star Formation, Near and Far"

2.

Data have no proprietary period
Available immediately to broader HST community Observations are protected against duplication by Cycle 17 GO programs Archival proposals based exclusively on WFC3 ERS data are not permitted in Cycle 17, but GO/AR programs can propose complementary or supplementary programs

3. 4.

US Co-Is will receive funding
Standard budget review by the Financial Review Committee

Observations will be executed early in Cycle 17
Provide early feedback on WFC3 scientific performance

STUC Meeting October 18 2007

10


WFC3 ERS Observations
Two-part program
Star Formation at Half the Hubble Time
Measurement of the star formation and stellar mass assembly rates from H-alpha grism spectroscopy and the rest-frame UV Determination of the evolution of the faint end of the galaxian luminosity and mass functions UV and IR grism/broadband imaging, complementing existing ACS data 104 orbits covering ~30% of GOODS CDFS field

Star Formation in Nearby Galaxies
Measurement of the star formation history and IMF in a range of environments UV and IR broad/narrowband imaging, complementing existing ACS data Targets include 30 Doradus, NGC 4382, NGC 4150, Cen A, M82 and M83 Further details at http://www.stsci.edu/hst/proposing/docs/WFC3-ERS COS GTO program at http://www.stsci.edu/hst/proposing/docs/COS-GTO
STUC Meeting October 18 2007 11


Multi-Cycle Treasury Programs

12


Rationale
SM4 is the last shuttle servicing mission to HST
A successful SM4 will give HST its most powerful suite of instrumentation Instruments don't last forever <4 years per string? [ACS & STIS will be single-string instruments] We need to heed the Soifer criterion: "What are the science programs that would make us look really stupid if we didn't do them?"

Past Large/Treasury programs
Median size ~130 orbits 4 programs > 300 orbits

Are there science programs that require larger allocations?
STUC Meeting October 18 2007 13


Multi-cycle Treasury Programs
Call for white papers issued in early October
3-page descriptions of HST science programs that require >400 orbits No restrictions on type of program ­ spectroscopic, photometric, astrometric Deadline: 30 November Confidential assessment by small committee: Brad Peterson, Malcolm Longair, Bob Williams, INR Recommendation made to Director by mid-January 2008 Result announced to the community in late January (well before Cycle 17 deadline)

Selection process, if implemented, still TBD

STUC Meeting October 18 2007

14


HST Lunar Initiative

15


HST and the Moon
Pointing HST at the Moon is not easy
No guide stars (obviously) need 3 gyros Tracking rates up to 5 "/second Require substantial resource investment by STScI & HST Project

But HST has observed the Moon
GO 6513 (1996, PI: Stern) observed the lunar atmosphere 1 degree from the Moon's limb with the Faint Object Spectrograph and the High Resolution Spectrograph. GTO/OS 7717 (1998, PI J. Caldwell) observed the Moon with the Space Telescope Imaging Spectrograph (STIS) and the Wide Field Planetary Camera 2. GO/DD 8539 (1999, PI E. Barker) observed the impact of Lunar Prospector with STIS. NASA 10719 (2005, PI J. Garvin) observed the Moon with ACS ­ UV imaging for mineralogical composition
STUC Meeting October 18 2007 16


HST and the Moon ­ Garvin program

STUC Meeting October 18 2007

17


The Moon in Cycle 17 & beyond
STScI has been asked by SMD to support NASA's Vision for Space Exploration via the lunar science community
HST observations in support of LCROSS (January 2009) GO proposals to observe the Moon enabled in Cycle 17 call for Proposals User Information Report on "Observing the Moon" available from Nov 1st to aid proposers DD allocation of ~25 orbits to shuttle astronauts (Grunsfeld et al)

Lunar initiative for exploratory science
Call for white papers on potential science programs ­ deadline 31/1/2008 White papers assessed by Lunar Advisory Group (LAG) Technical assessment by STScI HST MO Recommendation to Director by June 2008 Approximately 30 orbits of DD time potentially available for exploratory lunar programs in Cycle 18
STUC Meeting October 18 2007 18