Документ взят из кэша поисковой машины. Адрес оригинального документа : http://www.stsci.edu/institute/stuc/novem10/stuc_nasahqnov2010.pdf
Дата изменения: Wed Nov 3 17:35:28 2010
Дата индексирования: Fri Feb 11 07:07:24 2011
Кодировка:

Поисковые слова: http www.badastronomy.com bad tv foxapollo.html
Headquarters Update
Eric P. Smith JWST & HST Program Scientist

1


Topics

· · ·

HST items JWST Status update

Astrophysics Division update

2 1


Discussion
·
Should Hubble change its proprietary period policy?

· ·
·

Is there a better way to operate Hubble in the coming years to maintain or increase its science return per dollar?
What Hubble instrument(s) or capabilities constitute a minimum operational set? How do we, the scientific community, help the public "let go" of Hubble some day?
3


Hubble
· · ·
Projected HST lifetime
HST Entry into Senior Review 2012 HST Deorbit Study

4 2


HST Lifetime

5


Senior Review
· ·
Peer Review of Operating Missions

"Performance factors are to include scientific productivity, technical status, data dissemination, future plans and expectations, and budget." Opportunity to get community input for new methods of operation
6

·


James Webb Space Telescope

7


JWST Hardware Status
Primary Mirror Segment Aft Optics System PM Flight Backplane Tertiary Mirror

SMSS Pathfinder Strut

Fine Steering Mirror ISIM Flight Bench

SM Hexapod

Mid-boom Test Secondary Mirror Segment Membrane Mgmt Pathfinder Membrane IC&DH unit ETU

8 3


Cryogenic Test #5: EDU gold

9 4


Flight Mirror Polishing Results

10 5


Primary Mirror Segment Assembly Schedule

* * * *

11 6


Mirror Scorecard

12 7


Engineering Test Units Instruments
MIRI NIRSpec FGS NIRCam

8

ISIM OSIM Structure http://www.jwst.nasa.gov/webcam.html
13 8


Webb Flight Science Instruments

NIRSpec Flight Model

NIRCam Flight model under assembly

FGS Flight model

MIRI Flight model

14 9


ISIM Structure Cryoset Test

15 10


Near Term Events
·
MIRI flight Focal Plane System (FPS) delivery to RAL has been split into two parts

· · · · · · · · ·

Detectors will be delivered in November 2010 Electronics (FPE) will be delivered in late December 2010 or January 2011

Major 2011 deliveries: Deliver Flight NIRSpec to GSFC in May ISIM Flight Structure delivery to I&T in May ISIM Electronics Compartment Flight Model in May

Deliver Flight FGS to GSFC in May
Deliver Flight NIRCam to GSFC in July Deliver Flight MIRI to GSFC in June
16 11


What is the Programmatic Status?
·
TAT, ICRP, SRB, APMC, ...

17 12


·

Testing Assessment Task
Budgetary, technical and schedule concerns related to cryo-optical test plans reviewed at the mission CDR led to the formation of an independent, external task to review integration and testing plans for JWST Reviews sought on ISIM and OTE integration and test plans and science requirements driving those plans
18 13

·


ISIM Test Configuration
SES chamber
GHe shroud instillation and test completed July 09

LN2 Shroud He shroud

ISIM

OSIM

Fold Mirror 3 Tip/Tilt Gimbal Assembly

Vibration Isolation Supports
Alignment Diagnostic Module OSIM Primary Mirror

19


The (OTE + ISIM = OTIS) Test

20 15


·

A testing is required at JSC to reach a reasonable level of mission risk

TAT Recommendations (Highlights) hanical significant level of thermal, optical, and electrical/mec
Time required for OTIS could potentially be reduced

·

·
·

ISIM test times at GSFC could be reduced Management of I&T program and its risks will require a clear definition of critical items including test priorities, predicted results, decision criteria, and contingency plans (HST Servicing Mission Orbital Verification model suggested as a way to ensure this) Relaxation of the science requirements to a straightforward simplification of test simplification of test plans or relaxing of does not necessarily mean that science met.
21 16

·

http://www.jwst.nasa.gov/publications.html

would not necessarily lead plans. Conversely, some testing requirements requirements will not be


·

Independent Comprehensive Review Panel (ICRP)
June 29, 2010 letter from Senator Mikulski to NASA Administrator Bolden requesting independent and comprehensive review of JWST program

· ·

Activity completed, report due this week
Output relevant to FY11 appropriations
22 17


ICRP To Examine
1. The technical, management and budgetary root causes of cost growth and schedule delay 2. Current plans to complete development, with particular attention to the integration and test program and management structure 3. Changes that could reduce cost and schedule or diminish the risk of future cost increases without compromising Observatory performance 4. The minimum cost to launch JWST, along with the associated launch date and budget profile, including adequate reserves
23 18


Astrophysics Division

24 19


Astrophysics Mission Timelines

Green: operational, Brown: development, Blue: Formulation
25 20


Astrophysics Near Term Schedule
Dec

26 21


Astrophysics Program

27 22


Decadal Priorities

28 23


New Opportunities
Release Due Date Contact Person

ESA M3 Cosmic Visions Letter of Acknowledgemen t WFIRST SDT Euclid Science Team Member Explorer Call

10-6-2010

10-25-2010

Paul Hertz

10-19-2010

11-23-2010

Rita Sambruna Richard Griffiths Barbara Giles

10-21-2010

12-20-2010

11-01-2010
29

02-16-2011


Discussion
·
Should Hubble change its proprietary period policy?

· ·
·

Is there a better way to operate Hubble in the coming years to maintain or increase its science return per dollar?
What Hubble instrument(s) or capabilities constitute a minimum operational set? How do we, the scientific community, help the public "let go" of Hubble some day?
30