The JWST team successfully passed the SDR on January 24-27. In this GSFC review, the major system engineers described the overall design or function of their subsystem or major test in the context of the mission requirements. This is a significant milestone on the path to the Preliminary Design Review (PDR), now scheduled for early 2008.