Date: Wed, 16 Mar 2011 21:19:14 -0400
From: Kenneth Sembach
Subject: Fwd: Flash Report - Successful Gyro 6 Power On

Begin forwarded message:

From: "Murphy, Dave"
Date: March 16, 2011 4:47:38 PM EDT
Subject: Flash Report - Successful Gyro 6 Power On

As part of the gyro reconfiguration effort, Gyro 6 was successfully
powered on at 2011/075/19:21:31.б  Heater operation was verified to be on
the primary controller.б  Subsequent gyro operation was nominal and the
subsequent vehicle slew at 19:28 and GS acquisition at 19:43 were
successful.б  A bias update occurred at 20:44 with values of [-1.3, 16.0
б 18.6] arcsec/hr, so the thermal environment change in RSU 3 (gyros 5 & 6)
did not significantly perturb the gyro 5 bias. б Ops Note 2199 was
submitted to modify the relevant ground system limits.
б 
The next activity in the reconfiguration process will occur on Friday at
077/18:20 (2:20 pm EST).
б 
David Murphy
Hubble Space Telescope (HST), Code 441
Pointing Control Subsystem (PCS) Lead Systems Engineer (SE)
Honeywell Technology Solutions, Inc. (HTSI)
б