Draft
SMOV3b
OPERATIONAL CONSTRAINTS, RESTRICTIONS, AND ASSUMPTIONS (OCRA)
1. Limit
the shutter open time of WFPC2 to about one hour
throughout
BEA (hence no BEA science with WFPC2)
2. No WFPC2 pure parallels throughout SMOV
J.10.4.16 General Verification Requirements
J.10.4.16.1 The HST optics shall be protected from
contaminants being polymerized by the solar UV light reflected by the earth in
the early stage of outgassing following SM3.
The following con-tamination management plan shall be carried out to
provide the protection described below.
1.
Avoid pointing the +V1 axis within 15 degrees of bright earth limb from
the time HST is released by the Orbiter through release +3 days.
2.
Avoid pointing the +V1 axis within two degrees of the bright earth Limb
from release +3 days through release +12 days.
3. From release +12 days through release +42
days the cumulative exposure of the focal plane to the earth (+V1 axis within
two degrees of the bright-earth surface) is not to exceed the total bright
earth exposure (approximately six days) experienced by HST during the first six
weeks following the Second Servicing Mission.
J.10.4.16.2 A short-wavelength (approximately Lyman
alpha) stellar observation shall be performed.
J.10.4.16.3 Parallel operation of NICMOS, STIS, and
WFPC2, and ACS shall be demonstrated, with an allowance, if necessary, of
several weeks of response time between the first parallel test and subsequent
operations requiring parallel capabilities
1. WFPC2.
The following two assumptions apply to WFPC II at the point of HST
release:
a.
WFPC II is in PROTECT-SAFE mode.
b. The WFPC II shutter is closed with the F785LP filter in place.