Документ взят из кэша поисковой машины. Адрес
оригинального документа
: http://www.stsci.edu/smov/notes/0310smov.html
Дата изменения: Tue Mar 11 23:59:37 1997 Дата индексирования: Thu Feb 27 23:54:58 2014 Кодировка: Поисковые слова: http astrokuban.info astrokuban |
STATUS REPORTS 1. Observatory Status MOSES status reports: - PCS reported another guide star failure at 068/0532, which again was a WFPC2 Cycle 6 science observation. The observation proceeded on one guide star in FGS3. - All other observatory subsystems are nominal. 2. WFPC2 Status - Proceeding mnominally with Cycle 6 science and remaining SMOV monitors. 3. NICMOS Status - Engineering status - John Bacinski/STScI reported the results of his investigation into thermal behavior from day 045 to day 068 (Sat. evening). Prior to last week's inflection point, the Vapor Cooled Shield (VCS) had been cooling, per expectations, at about 2 degK/day. Since that time, the rate of temperature decrease has varied but seems to have settled in at around 6 degK/day. The last data points may even be the first indications of a slow-down in this rate. The absolute VCS temperature is now around 118 - 120 degK, compared to last week's post-inflection expectations of ~ 130 degK. The cold well temperature is currently between 57 and 59.5 degK, with a rate of increase that is apparently constant. - Science Status - The STScI and IDT are in agreement on the decision to proceed to coarse alignment and on the relevant parameters involved in its exection. The Coarse Alignment activity (7041) is scheduled for tomorrow afternoon. Prior to that time, NICMOS will be brought from BOOT to OPERATE after the most intense SAA orbits have completed. 4. STIS Status - Engineering Status - Over the weekend there was a Cal Insert Mechanism (CIM) re-try, the soecond of SMOV (HSTAR 5973). The operational workaround to correct the STIS data record problem reported in the notes from the last two meetings was successful each time it was needed this weekend for the STIS 7075. - Science Status - The data from the 3 iterations of of Coarse Corrector Alignment (7075) look good. The Coarse Corrector alignment activity is therefore complete and successful. This, along with a PDB aperture file update and slit location table updates, will enable the Point Source Acq Test (7067) starting in the SMS083. The "time-tag generic slew request" to correct the pre-alignment offset in the UV monitor (7063) target position was performed yesterday and the observation was successful. 5. FGS status - no new activity. Preparations for the FF3 Optimization Activity (7026) are in place for the 3 visits scheduled today and tomorrow. 6. FOC/COSTAR status- no new activity PLANNING REPORTS 1. Status of Upcoming SMSs - SMS069 - Currently executing. - SMS072 - Final Mode products are out for review. - SMS076 - Initial Mode products are out for review. - SMS079 - Built and under internal review. - SMS083 - Calendar built and ready for SAR requests. - Use of the SSR for engineering data record is scheduled to begin in this SMS. Dave Taylor and Greg Wenzel are making PASS preparations. 2. Replans - No new replans - MAMA HV Turn-on (7105) is delayed (from 21 March)for a minimum of 2 weeks. Assessment of downstream MAMA scheduling will be assessed. OPERATIONS STATUS 1. OPUS - Nominal. 2. Archive - No report.