Документ взят из кэша поисковой машины. Адрес оригинального документа : http://www.stsci.edu/sms-deliv/2006165-091647-smssb16.text
Дата изменения: Wed Jun 14 13:16:47 2006
Дата индексирования: Fri Feb 28 17:05:09 2014
Кодировка:

To : Distribution
From : Science Planning and Scheduling Team, STScI
Date : 14-Jun-2006 09:05:08 UT
SMS Supervisor : Bill Workman and ALan Patterson
(for Jack MacConnell) 443-540-5361 workman@stsci.edu
Subject : SMS SB165Q01: distribution of final products


The Mission Scheduler and Command Loader processing for the final run
of SMS SB165Q01 has been completed. The products have been reviewed
and approved for release and may be found at address SSSP.HST.NASA.GOV,
while comments on the PASS errors are included below. This distribution
includes MEGG and MOSR products in addition to MS/CL products.

SMS Name : SB165Q01
MS Run Name : SB165Q01_F
CL Run Names : SB165Q01_F1

Calendar Name : 061651A1
SMS Start Time : 2006.165:14:00:00
SMS End Time : 2006.166:02:00:00

****************************************************************************
****************************************************************************
THIS IS A H&S SMS for recovering from safemode event at 164/20:35:26.
****************************************************************************
****************************************************************************

The Operational Period Catalog and SPCs have been generated from the Command
Loads. The OPCat is:

/data/scheduling/spss_flight_data/pass/cl/sb165q01_f1/opc/op1650701.cat

CCS:
===
Product Notification Message, pnm_2006165090506.txt, fully enumerating
these products has been successfully transmitted via File Transport
Protocol (FTP) to the Control Center System (CCS) A,D,F,H strings.


PASS error analysis
===================



HST FINAL MODE LOAD APPROVAL FORM
=================================


SUBSYSTEM SIGN-OFF (ENTER NAME) DOY/TIME
--------- --------------------------- --------

DMS FC/SE
--------------------------- --------
EPS FC/SE
--------------------------- --------
I&C FC/SE
--------------------------- --------
OTA FC/SE
--------------------------- --------
PCS FC/SE
--------------------------- --------
SI FC/SE
--------------------------- --------
STSCI/SPST Bill Workman 165/09:05
Alan Patterson
--------------------------- --------

=======================================================================
FINAL AUTHORIZATION:


-------------------------------------------- -------------
MOSES FO MANAGER/MOSES SS APPROVAL TO UPLINK DOY/GMT

=======================================================================


Delivery Notes:
===============
This is a standard H&S. No special commanding or SI recovery activities
are included in this SMS.

There is one PASS Level 3 1655/03 CSHUPDHST error. This occurs at the
initial NSSC forced load break and is an artifact of the H&S SMS processin.
This message is not a concern.

A commanding review was completed and signed off
by Alan Welty. No problems were found with this SMS.


Ancillary information and reports:
==================================


The following proposals are scheduled on this SMS:
HS123 PROPOSAL TO DO 2-FHST MAPS
POINT SPSS GENERIC POINTING PROPOSAL



The following times of eng. formats have been scheduled in the SMS.

Format Start Time End Time
HN Start of SMS 2006.165:14:01:16
HN 2006.165:14:01:16 Beyond End of SMS



SOLAR ARRAY OPTIMIZATION SUMMARY REPORT
2006.165 05:56:22 VERSION= 3.3


Command: smsg -eps_merge -initial_saang=90.000000 061651a1

CALENDAR START= 2006.165:14:00:00 CALENDAR END= 2006.166:02:00:00

CALENDAR ID= 061651A1

NUMBER OF SA SLEWS= 0

SA COMMAND TIME +V1/SA-NORMAL SA_SLEW_DUR SA_SLEW_ANG
yyyy.ddd:hh:mm:ss (DEG) (SEC) (DEG)
----------------- ------ ----- ------





LEGEND:
Col 1 (SA COMMAND TIME) The time of the SASLWLIM EPS SMS statement.

Col 2 (+V1/SA-NORMAL) The angle between the V1 axis and the SA normal
vector, measured clockwise from V1 in the same
direction as the Sun, in degrees.
This is the EPS SMS SA angle following the SA slew.

Col 3 (SA_SLEW_DUR) The solar array slew duration, in seconds.

Col 4 (SA_SLEW_ANG) The solar array slew angle, in degrees:




Slew summary of Calendar 061651A1

Start Stop V1-SUN Beta Bay 5
ddd:hh:mm:ss ddd:hh:mm:ss RA DEC PA OR Angle Angle Incid

165:14:17:50 166:00:51:51 174 9 295 2 87 12.4 82
166:00:51:51 166:01:50:04 174 9 295 2 87 11.7 82





Note: The following gaps of more than 4 hours
between activities exist on this Calendar:

Separation Time Activity Next Activity Al after Gap
(ddd:hh:mm) (ddd:hh:mm) (ddd:hh:mm)

000:11:10 165:14:35 166:01:45 POINT:HF:01




COMCON Block Summary
SMS FILE NAME: 061651A1
Calendar FILE NAME: 061651A1

Start Time End Time Duration Service T H Rate Prop Prg Ob Al Vn
------------ ------------ --------- ------- - - --- ------------------



Distance between target and 1-star acq guide star
SMS FILE NAME: /data/scheduling/spss_flight_data/pass/msin/sb165q01.sms

LABELS: START TIMES: DELTA PRI TAR RA/ TAR DEC/ TARGET
SLEW/ SI GSACQ/ TIME FGS GS RA GS DEC DIST
GSACQ NAME NEXT SLEW (SEC) (DEG) (DEG) (AMIN)
-------- ---- ----------------- ------- --- -------- -------- ------



WFPC2 AP17 Controlled Exposures in SB165Q01

Start Time Duration(sec) End Time(approx) SCAP
--------------------------------------------------------------------