To : Distribution
From : Science Planning and Scheduling Team, STScI
Date : 14-Oct-2008 19:52:29 UT
SMS Supervisor : Dave Adler 410-338-4458 adler@stsci.edu

Subject : SMS SB289S00: distribution of final products


The Mission Scheduler and Command Loader processing for the final run
of SMS SB289S00 has been completed. The products have been reviewed
and approved for release and may be found at address SSSP.HST.NASA.GOV,
while comments on the PASS errors are included below. This distribution
includes MEGG and MOSR products in addition to MS/CL products.

SMS Name : SB289S00
MS Run Name : SB289S00_F
CL Run Names : SB289S00_F1

Calendar Name : 082892B2
SMS Start Time : 2008.289:22:00:00
SMS End Time : 2008.290:16:00:00


The Operational Period Catalog and SPCs have been generated from the Command
Loads. The OPCat is:

/data/scheduling/spss_flight_data/pass/cl/sb289s00_f1/opc/op2881501.cat

CCS:
===
Product Notification Message, pnm_2008288183812.txt, fully enumerating
these products has been successfully transmitted via File Transport
Protocol (FTP) to the Control Center System (CCS) A,D,F,H strings.


PASS error analysis
===================



HST FINAL MODE LOAD APPROVAL FORM
=================================


SUBSYSTEM SIGN-OFF (ENTER NAME) DOY/TIME
--------- --------------------------- --------

DMS FC/SE
--------------------------- --------
EPS FC/SE
--------------------------- --------
I&C FC/SE
--------------------------- --------
OTA FC/SE
--------------------------- --------
PCS FC/SE
--------------------------- --------
SI FC/SE
--------------------------- --------
STSCI/SPST Dave Adler 288/19:52
--------------------------- --------

=======================================================================
FINAL AUTHORIZATION:


-------------------------------------------- -------------
MOSES FO MANAGER/MOSES SS APPROVAL TO UPLINK DOY/GMT

=======================================================================


Delivery Notes:
===============


There are no errors of note in the MS or CL.

****************************************
THIS IS AN 18 HOUR HEALTH AND SAFETY SMS
****************************************


*************
SI Commanding
*************

There is no SI commanding on this SMS.


***************************
K-factors for the FGSes
***************************

PFGSINIT is called at 2008.289:23:05:01 to setup the default
K-factors for the FGSes.


*************
TDRS SCHEDULE
*************

These products have been generated with a TDRS schedule that
has not yet been implemented on the UPS.

The TDRS schedule for the H&S interval will be updated to match
the H&S schedule immediately following entry into PSEA mode on
Wednesday morning.

If the transition from the excuting 082877A3 SMS does not occur,
then no changes will be made to the TDRS schedule.


****************************************
Commanding Notes for Flight SMS 082892B2
****************************************

The Commanding Team has completed its review of flight SMS 082892B2
and has found no problems. We have no formal input for its delivery.

Alan Welty / CMD x4948
Ancillary information and reports:
==================================


The following proposals are scheduled on this SMS:
Error retrieving data from spss database



The following times of eng. formats have been scheduled in the SMS.

Format Start Time End Time
HN Start of SMS 2008.289:22:01:16
HN 2008.289:22:01:16 Beyond End of SMS




Error finding eps_ros_file!



Slew summary of Calendar SB289S00

Start Stop V1-SUN Beta Bay 5 Bay 8
ddd:hh:mm:ss ddd:hh:mm:ss RA DEC PA OR Angle Angle Incid Incid


Error generating slew summary!





Note: The following gaps of more than 4 hours
between activities exist on this Calendar:

Separation Time Activity Next Activity Al after Gap
(ddd:hh:mm) (ddd:hh:mm) (ddd:hh:mm)


Error generating sci gap report!



Error Creating COMCON Block Summary


Distance between target and 1-star acq guide star
SMS FILE NAME: /data/scheduling/spss_flight_data/pass/msin/sb289s00.sms

LABELS: START TIMES: DELTA PRI TAR RA/ TAR DEC/ TARGET
SLEW/ SI GSACQ/ TIME FGS GS RA GS DEC DIST
GSACQ NAME NEXT SLEW (SEC) (DEG) (DEG) (AMIN)
-------- ---- ----------------- ------- --- -------- -------- ------



WFPC2 AP17 Controlled Exposures in SB289S00

Start Time Duration(sec) End Time(approx) SCAP
--------------------------------------------------------------------