Документ взят из кэша поисковой машины. Адрес оригинального документа : http://www.stsci.edu/spss-shift/16088.rpt
Дата изменения: Tue Mar 29 00:20:35 2016
Дата индексирования: Sun Apr 10 08:21:58 2016
Кодировка:

Поисковые слова: http www.astronomy.com
SPST Shift Summary
28-Mar-2016 Day 088
** Day Shift **


Personnel: Ferrara, Hathaway, Wymer

Shift Checkout by: Wymer

System Status:
Diskspace: DATA: @93% TREE: @93% PREP: @93% MS: @93%

Calendars in progress: 160953b1, 160975a5

SMS status: sa095000, sa097000 in progress

Ephemeris Processing: Generated orbit file or16088wa -jef


FLIGHT:


16109:
from Hathaway -
o Generics for 16109.


16095
from Wymer -

o Moving on with SMS generation for this first piece of the calendar 160953b1.

o Checklisting the SMS: All looks good!

o Sent 160953b1 to PASS sa095000

o Pulling down final TDRS schedule.

o Starting up a PASS run. I double-checked the PDB and CAL pickles to be used in
the PASS processing for the two halves of this week with Merle. Merle
confirmed that the latest versions of these files are the ones to be used. I
should just keep on the lookout for new files that are tagged with a start
date after 16.095 - don't use these files tagged to start after 16095.

o Forced load break time at end of this piece will be 16.097:15:20:00.000
(between last two sets of DWAIT and MNOOPS commands) for both processors.

o Submitted PASS run

o In the log file I see complaint of an unrecognized TDRS service SSC I39 and
that it was ignored. Something popped up a little before about that, but both
messages just seem informational. It is possible that the services that it's
complaining about are on the 16088 calendar. The service was ignored by PASS

o Checklisting:
1 227 that is OK to fly, 73 replaces & 2 deletes
1517 CL error that needs to be remedied

o 1517 CL error resolution:

Merle confirmned that a new merge sms will be needed to correct the problem.

pa095000.sms is now in the $PASSOPS/msin directory to be included in future
PASS runs.

o Sent all 77 replaces/deltes to NCC, pulled down the latest TDRS schedule, no
incomplete events, ran tdrs_lis_xfer

o Setting up PASS run #2, added the pa095000 merge sms to this run and submit.

o Log file looks OK. Checklisting:
Same 227, no replaces, no check_occults error this time and no CL level 3
errors. Ready for AVTUT.

o AVTUT - 25 replaces, 3 adds. Sent to NCC, no incomplete events

o PASS run #1 after AVTUT: no unexpected MS or CL errors, 18 replaces, 1 delete

o Sent replaces to NCC, no incomplete events.

o PASS run #2 after AVTUT: no unexpected errors and no replaces


16097
from Wymer -

o Looking at the STISLs, the STIS LV looks to be handled correctly. Check #18
appears to be complaining about a bit more, upon closer examination. The STIS
LV is being handled properly so those errors can be disregarded. The slew
errors are still curious.

o I have sent the slew errors to Merle for review.

o Ok, so these errors are expected when a dogleg slew is involved so I need not
worry about them and can continue on with SMS generation for this second half.
I have already generated the SMS for the 160953b1 (first half).

o SMS generated and checklisted. All OK.

o Sent to PASS sa097000

o I will wait to start PASS processing on this half until AVTUT is run and
PASS comes back clean on the 1st half

o 16095 has gone through AVTUT and is clean. I'll begin PASS processing for this
half of the week.

o PASS run #1:
2 227 errors, 1 associated 229 error, 117 replaces and 6 deletes
Checklist #10 fails and complains that the first half of the week that I used
as continuity, has not been delivered. This is expected and OK.

o Sent replaces to NCC. Will resume tomorrow with pulling down a fresh TDRS
schedule, running tdrs_lis_xfer, and another round of PASS processing.


BUGS ENCOUNTERED:

MISCELLANEOUS: ********************************************************************************
NO swing shift report!