Äîêóìåíò âçÿò èç êýøà ïîèñêîâîé ìàøèíû. Àäðåñ îðèãèíàëüíîãî äîêóìåíòà : http://xmm.vilspa.esa.es/calibration/documentation/epic_cal_meetings/200102/EPIC_operations-S_Rives.pdf
Äàòà èçìåíåíèÿ: Wed May 14 13:35:20 2014
Äàòà èíäåêñèðîâàíèÿ: Wed Apr 13 13:42:20 2016
Êîäèðîâêà:

Ïîèñêîâûå ñëîâà: annular solar eclipse
XMM-Newton TTD Meeting Status of EPICs operations
7th of February 2001 StÈphane Rives

XMM
1


Status of EPICs operations - Introduction
1) Current situation since last TTD meeting (October 2000) 2) Recent implementations applicable after next database release (7th of February) 3) Foreseen tasks and improvements

VILSPA : 31st January 2001

XMM
2


Status of EPICs operations - Part 1
1) Slew exposures 2) Bright Pixel Tables 3) Offset Calculations 4) EPDH version I Loading 5) Timing mode 6) Double Bore-sight 7) Super ED 8) In house tools
VILSPA : 31st January 2001

XMM
3


Part 1 - Slew exposures
· · Functionality in place in MP System for EPIC's as of REV-166 Implementation: ­ Slew exposure inserted only if Open Loop Slew longer than 3800 sec and restricted to Open Loop slew => 1 slew exposure every 3.5 revolution: inefficient! ­ Slew exposures are currently of fixed length (1 h); RCR on XSCS to increase flexibility (variable duration) ­ The Slew exposures consist of:
· MOS : Full Frame exp . With FW = MEDIUM CAL (i.e. open position ! !) · PN: same mode as p er last ex posure w ith FW = CLOSE_CAL

·

Operational aspects: ­ Radiation alert procedures also apply during slew (for EPIC-MOS): procedures updated accordingly ­ If previous exposure not successful, then PN slew exposure needs to be skipped: CRP_SYS_5004 updated accordingly

VILSPA : 31st January 2001

XMM
4


Part 1 - Bright Pixels Tables

· · ·

PN bright pixels/columns: new B PT in the database release 3.7 on the 13-12-00. Sy stematically used as of rev. 192. MOS bright pixels table: new BPT in the database relea se 3.7 on the 13-12-00. Uploade d and systematically used as of rev. 186. Satisfying resul ts

VILSPA : 31st January 2001

XMM
5


Part 1 - Offset tables
1) MOS: · · · No change to the fixed offset tables. Tables corresponding to LW, SW and FF modes for all FW positions. Timing mode and Full Frame Double Nodes mode still require an offset calculation. Any delivery foreseen?

2) PN · The offset calculation used up to now w as suspected to be responsible for the instabil ity observed at the Bright Pixel l evel. PN scientists recently p roposed to go back to the calculation method used at the beginni ng of the mission.
VILSPA : 31st January 2001

XMM
6


Part 1 - EPDH version I loading
On the 19th of January, versio n I of the EPDH software has been uploaded · Fix of two non-conformances: ­ XMM-NC-VIL-0009: rejected TLC ­ XMM-NC-VIL-0014: HBR Data Mixed In-flight behavior nominal up to now.

·

VILSPA : 31st January 2001

XMM
7


Part 1 - Timing mode
1) MOS: · · MOS1: works quite wel l. MOS2: seldom works. Problems not fully un derstood and under investigation . No action in concrete but ide as dealing wi th the voltages setting toge ther with the uploa d of Fixed Offset Tables.

2) PN: · Timing mode suffers from a high background level

VILSPA : 31st January 2001

XMM
8


Part 1 - Double Bore-sights (1/2)
Requirements:
­ The current bore-sights of RGS & PN are not optimised; improvement required. ­ Using a "better" bore-sight for RGS & PN implies that the MOS window modes (Small/large Window, Timing) don't work any longer ­ Need to:
· re-define CCD sequences for above modes (Instrument team) · have different CCD sequences for RGS and PN prime, respectively · re-commission completely the EPIC-MOS window modes for both RGS & PN prime · have an automatic selection for different activities (for the same mode) depending on which instrument is prime (RCR issued on XSCS)

VILSPA : 31st January 2001

XMM
9


Part 1 - Double Bore-sights (2/2)
Implementation activities
­ Several functional tests have been executed since beginning of October with the following outcomes:
· MOS-1 / RGS prime: LW OK (with increased integration time), SW OK with increased integration time & reset voltage set to 8 V, Timing OK · MOS-1 / PN prime: LW OK, SW OK, Timing OK · MOS-2 / RGS prime & PN prime: LW OK, SW OK, Timing OK

­ Performance tests:
· RGS bore-sight: all modes successful except MOS 2 Timing, but the centering was not perfect: new SIAM matrix required · PN bore-sight: executed in LW only. The test was aborted due to incorrect pointing. Reason: sign error on the SIAM matrix. A new one is to be delivered.

VILSPA : 31st January 2001

XMM
10


Part 1 - Super ED

· ·

A Super ED for any mode exists now for MOS and PN and can be used in case of contingency . Last one created: PN exetended Full Frame (with and wi thout offset dump)

VILSPA : 31st January 2001

XMM
11


Part 1 - In House Tools
MOS: · · · Tool created to generate automatically the Database sequences corresponding to the inpu ts for the clock sequencers. Tool with the same capabili ties also created for the Offset tables and the Bright Pi xel Tables. An ICD has been produced : XMM-SOC-ICD-0016-SSD issue 2.0

PN: · Pending task
VILSPA : 31st January 2001

XMM
12


Part 2 - Recent implementations
Recently, many items have been implemented on the datab ase which wi ll be deliv ered on the 7th of February. These ne w features will be app licable as of the timeline gen eration process will use thi s new database. 1) Optimisation on MOS 2) New activitie s 3) New sequences and ED to perform the bore-sight tests 4) Slew Failu re on MOS 5) PN offset calculations
VILSPA : 31st January 2001

XMM
13


Part 2 - Optimisation on MOS (1/2)
New global approach for the upload of the offset tables and the sequencers configuration for optimisation purposes on MOS. · Up to now, peripheral offset tables were loaded at the beginning of each exposure. As they are used in all the modes except for a few "exotic" ones, it was a waste of time. The central CCD sequencers were reconfigured to FF when the mode was not FF at the end of the activity. Upload of the peripheral CCDs Offset Tables and reconfiguration of sequencers have now been discarded from all the activities (End of Observation activity included) except for the following ones: Diagnostic, Diagnostic 3x3. Only those activities which configure the peripheral CCDs to another mode than FF (at sequencer and Offset Table levels) perform a reconfiguration at the end of the activity to FF (exception of Timing mode).
VILSPA : 31st January 2001

· ·

·

XMM
14


Part 2 - Optimisation on MOS (2/2)

Consequences: · · Slew exposures w ill be now performed in the last imaging mode. Gain of time from 5 to 8 minutes per observation

VILSPA : 31st January 2001

XMM
15


Part 2 - Activities created/modified on MOS
Two new activities have been created/modified on MOS

·

FF exposure with FW closed and no BPTs loaded. Objective: analyze the current status of all the CCD pixels.

·

Diagnostic 3x3: 10 diagnostics per CCD are performed instead of one previously. Total duration of the diagnostic lower than the required 8000 seconds.

VILSPA : 31st January 2001

XMM
16


Part 2 - New Bore-sight ED/SEQ

· ·

New sequences and EDs have been implemented for MOS to configure the sequencers for the two ty pes of Bore-sight. These sequences and EDs will be used for the next tests to be performed soon.

VILSPA : 31st January 2001

XMM
17


Part 2 - Slew Failure on MOS
Previously , MOS was disabled i n case of a slew failure. · Now, the MOS are kept enabled and the "return on targe t" is flagged. This applies to al l the modes where we don 't calculate the offset . Gain of time and operations smoother. This improvement was not possible for PN because an o ffset calculation is al ways necessary on PN

·

VILSPA : 31st January 2001

XMM
18


Part 2 - PN offset calculations (1/2)
· It has been decided to return to the old settings for the offset calculation on P N (the ones used at the beginn ing of the mission). For all the modes, the method used is "Median correction Off" and 94 frames are used to carry out the calcula tion. On top of giving better results, thi s new method is faster for FF and LW (a little bit slow er for Ext. FF). Test Super ED have also be en created to get rid of the calculation of the first 12 columns which are n ot used for the observation (gain of time). At the same time, the MIP reduction has been reduced to 1 column (2 previously ).
VILSPA : 31st January 2001

·

·

·

XMM
19


Part 2 - PN offset calculations (2/2)

· ·

Consequences: modification of all the activi ties and Super EDs on PN. Gain of time in most of the cases. In the same frame, the activity to perform a standalone offset and noise calculati on has been fixed and can be used now.

VILSPA : 31st January 2001

XMM
20


Part 3 - Foreseen tasks and improvements
· EMDH version J expected soon . If not received before the 16th of February, it wi ll be loaded after the eclipse season (19th of March to 24th of April). Procedures to handle possib le spurious trip off from ON to OFF of the LCL need to be implemented. Bore-sight: waiti ng for the go ahead to perform the performance tests. When the Sequences/ EDs are validated, i mplementation of new activities (the Offset tables have b een delivered) Can we expect an offset table for Timing mode on MOS? A few changes in the op erational approach w ill be incorporated for the next eclipse season.
VILSPA : 31st January 2001

· ·

· ·

XMM
21