Документ взят из кэша поисковой машины. Адрес оригинального документа : http://zebu.uoregon.edu/~uochep/talks/talks06/brau10-06.pdf
Дата изменения: Thu Dec 7 23:35:25 2006
Дата индексирования: Tue Oct 2 11:13:24 2012
Кодировка:
Prospects for ILC Detector R&D Funding
DOE Report (Paul Grannis representing both agencies) P5 Report LCDRD funding (FY06-07 Supplement ILC Detector R&D Plan

and FY07)

J. Brau

SiD Workshop, October 28, 2006

SLAC


ILC university grants
In 2002, University Consortium for Linear Collider (UCLC) aimed at NSF, and Linear Collider Research and Development (LCRD) aimed at DOE were established to promote LC research at universities ­ both accelerator and detectors. First LCRD and UCLC awards were made in FY03.
Detector DOE NSF FY03 FY04 FY05 FY06 $412K $700K $700K $1048K $0K $0K $117K $300K Accelerator DOE NSF $400K $400K $650K $700K $0 $93 $119K $235K
Grannis 9/8/06


University grant process

Relevant bodies (ALCPG, LCSGA, ART ... have screened university proposals and made recommendations to DOE and NSF. DOE and NSF have done a joint review and selected proposals for support without constraints on who funds, within the overall budget guidance. Since FY2005, the detector grants have been administered through a single umbrella grant to Univ. Oregon. DOE accelerator grants are to specific universities. NSF uses Cornell for umbrella grant.

Grannis 9/8/06


NSF/DOE position on ILC R&D activity
"Both DOE and NSF recognize the high priority placed by HEPAP and the recent NRC EPP2010 report on conducting a vigorous R&D program that could lead to the ILC project. Both agencies currently fund university grants for both detector and accelerator research with applicability to the ILC. These programs have been modest but have grown over the past several years. "Both agencies respond to grants through the peer review process. They welcome proposals for which ILC detector or accelerator R&D is the whole or a component of the effort, as well as for generic research that may have some bearing on ILC issues. In addition, there is often some latitude within existing grant funds to consider new directions. The use of existing grant funds for ILC-related research depends upon the details of each proposal and grant holders are encouraged to speak with their program monitors on the appropriate extent of such activities." Grannis
9/8/06


Comments on university detector grants
A 2005 WWS panel chaired by C. Damerell compared funded and self-estimated needs for detector R&D in the three regions. The US and Japan lagged behind Europe significantly. The US effort was about 4 times less than Europe, and was funded at about 35% of the estimated need. (Japan received ~$1M new funding recently.)

Grannis 9/8/06


Detector R&D outlook
ALCPG proposes to increase ILC detector R&D at universities to ~$3M in FY2007, with ~$1M early in year for specific deliverables related to tests and ~$2M for the base program later in the year. If the FY2007 ILC appropriation is at the President's request (and House markup), DOE will try to meet this goal and continue detector R&D effort and infrastructure at Labs. DOE/NSF require a plan for multi-year detector R&D with goals, milestones and resource needs. Will peer review proposals, and expect a detector R&D review. Grannis
9/8/06


Detector R&D outlook
We aim to strengthen the interaction of lab and university detector R&D efforts, and treat program as a coordinated whole. University detector R&D program will continue and should grow. Much of the current funding is for generic R&D. Need to plan the transition to detector collaborations & proposals. There is at present no body that is ideally suited to advise on the relative priority between machine-related R&D and detector R&D. For FY2007, we are using LCSGA for this Grannis advice.
9/8/06


Rough estimate of R&D phase funding
Out year integral taken from the EPP2010 estimate ($500M over 5 years) plus detector and laboratory SCrf infrastructure., with a canonical `project' profile. Assumes construction funding starts in 2012.
250 $250M 200 $200M

150 $150M

100 $100M

detectors SCRF R&D, design

FY2007 is President's request and House markup; Senate is lower.

50 $50M

2005

2006

2008

2001

2002

2003

2004

2007

2009

2010

2011

2012

Grannis 9/8/06

0 2001 20 02 2003 2 004 200 5 2006 20 07 2008 2009 201 0 2011 2 012


EPP 2010: Elementary Particle Physics in the 21st Century



Detector R&D - WWS
· WWS created the Detector R&D Panel
­ collect information on projects world-wide ­ strengthen coordination and prioritization
­ J-C. Brient (IN2P3), CJS Damerell (RAL), R. Frey(Oregon), HankJoo Kim (Kyungpook Natl), W. Lohmann (DESY), D. Peterson (Cornell), Y. Sugimoto (KEK), T. Takeshita (Shinshu U), H. Weerts (ANL)

· R&D Panel prepared the R&D report to accompany the GDE machine Baseline Configuration Document early this year
­ supported by concepts and R&D teams
J. Brau SiD Workshop ­ SLAC October 28, 2006


Detector R&D - WWS
· R&D Panel Report
­ Draft circulated beginning in January ­ Report updated in April & posted on WWS web page
· http://physics.uoregon.edu/~lc/wwstudy/R&D Report-final.pdf · Urgent needs require $32M and 1870 man-years over next 3-5 years - globally · Established support over 3-5 years $15M and 1160 man-years - globally · Translating man-years to dollars ($100k/man-year)
­ $33M/yr established over 4 years, $22M/yr more required

· Support notably behind in North America and Japan

· Planning review of R&D
­ Begin in Beijing
J. Brau

- Tracking
October 28, 2006

SiD Workshop ­ SLAC


University Detector R&D in US
This year was the fourth year of support for detector R&D from the agencies since it was first organized by the LCSGA (formerly USLCSG) and the ALCPG

FY05 LCDRD funds $700,000 ­ DOE $117,000 ­ NSF
24 projects 25 universities

FY06 LCDRD funds $1,048,000 - DOE $ 300,000 - NSF
34 projects 26 universities/labs

http://physics.uoregon.edu/~lc/lcdrd/fy05-awards.html http://physics.uoregon.edu/~lc/lcdrd/fy06-awards.html
J. Brau SiD Workshop ­ SLAC October 28, 2006


FY07 University Detector R&D in US
We are organizing ourselves in anticipation for increased funding in FY07 ­ discussed $3M (5 year R&D plan being developed by ALCPG) Encourgement led to developing a proposal early for a few (9) high priority, urgent efforts (~$1M) followed by annual round for another $2M Supplemental proposal 1 ­ call for abstracts (received 22) 2 ­ selection of highest priorities/urgent needs (9)
http://physics.uoregon.edu/~lc/lcdrd/supplement-06a.html
J. Brau SiD Workshop ­ SLAC October 28, 2006


Supplemental LCDRD Proposal
· · · · · · · · · High Performance Digital Hadron Calorimetry for the International Linear Collider PI - J. Repond Development of a Silicon-tungsten Test Module fo an Electromagnetic Calorimeter PI - R. Frey TPC Development PI - D. Peterson Pixel Vertex Detector R&D for Future High Energy Linear e+e- Colliders PI - C. Baltay Energy Spectometers for the International Linear Collider PI - E. Torrence/M. Hildreth Pixel-level Sampling CMOS Vertex Detector for the ILC PI - G. Varner Detector to Measure the Beam-strahlung Gammas PI - W. Morse Long Shaping-Time Silicon Microstrip Readout PI - B. Schumm Scintillator Based Muon System R&D PI - P. Karchin

2 2 3 1 1

VXD TRK CAL Muon LEP

This resulting distribution was not by design

http://physics.uoregon.edu/~lc/lcdrd/supplement-06a.html
J. Brau SiD Workshop ­ SLAC October 28, 2006


FY07 University-based LCDRD Proposal
FY07 proposals will be accepted for continuing and new projects from DOE/NSF funding One year proposals (third year of 3 year cycle), and future 1-2 year plan (anticipating continuation) Anticipated timeline December 15, 2006 ­ status reports and new project descriptions due May ­ awards announced - revised budgets/descriptions September, 2007 ­ funded year begins
details posted on ALCPG web page http://physics.uoregon.edu/~lc/lcdrd/ comments are welcomed by all members of the ALCPG exec comm
J. Brau SiD Workshop ­ SLAC October 28, 2006


http://physics.uoregon.edu/~lc/lcdrd/

J. Brau

SiD Workshop ­ SLAC

October 28, 2006


J. Brau

SiD Workshop ­ SLAC

October 28, 2006


J. Brau

SiD Workshop ­ SLAC

October 28, 2006


US ILC Detector R&D Plan

J. Brau

SiD Workshop ­ SLAC

October 28, 2006


"Bottom Up"

J. Brau

SiD Workshop ­ SLAC

October 28, 2006


US ILC Detector R&D Plan
· Add milestones
­ ~ 4 per system over 5 years

· Needs further scrubbing · then submit to DOE

J. Brau

SiD Workshop ­ SLAC

October 28, 2006


Prospects for ILC Detector R&D Funding
DOE Report (and NSF) P5 Report LCDRD funding (2006/07
$3M this year

Supplement and FY07)

ILC Detector R&D Plan

J. Brau

SiD Workshop ­ SLAC

October 28, 2006