Astronet Поиск по астрономическим сайтам English Russian
       
        Точная форма слов   О проекте   Сайты   Справка
Поиск по:www.apo.nmsu.edu   - Поискать по всем серверам
На этой странице приведены все страницы сервера www.apo.nmsu.edu ,которые мы индексируем. Показаны документы 2621 - 2640 из 2817.

В начало ] Пред. | 128 | 129 | 130 | 131 | 132 | 133 | 134 | 135 | 136 | 137 | След.В конец ]

Упорядочить по: URL  |  дате изменения
2621. default
. Steward Observatory Photos M1 Hex Cells: September 23, 1999 . During an onsite visit by Steward Observatory personnel, these photos were taken of the backside of the M1 hex cells. These photos are in no particular order and are repeated at ftp/export/home/ftp/pub/images/miller . For a more detailed explanation of these photos, you're welcome to contact Mark Klaene/APO.
[ Сохраненная копия ]  Ссылки http://www.apo.nmsu.edu/Telescopes/ARCprogress/092499M1frac/default.htm -- 3.3 Кб -- 27.09.1999
Похожие документы

2622. teleinstproced
. TELESCOPE PROCEDURES . The following provide protocols and guidance for specific procedures . Emergency Enclosure Closing . Opening Enclosure . Enclosure Work Safety . Counterweight Settings . 2.5 meter Pre-flight Checklist . Supplement to the 2.5 meter Pre-flight Checklist
[ Сохраненная копия ]  Ссылки http://www.apo.nmsu.edu/Telescopes/SDSS/teleinstproced.htm -- 2.0 Кб -- 25.09.1999
Похожие документы

2623. Preparations for science:
2.5m Preflight Check . ... Preparations for Science: . ... If not already done, set Az and Alt brakes. Check that nothing is around/on the telescope which would interfere with altitude or rotator motion. ... Make an Alt move. Combine motion test with drive surface checking/cleaning to allow access to entire surface.* Set the Alt fiducial ( start at 14.5 and move up at 5000 cts/sec until crossed, put alt in hold then set fiducial ) Return Alt to ~18.5 deg when done. Set Alt brake. ...
[ Сохраненная копия ]  Ссылки http://www.apo.nmsu.edu/Telescopes/SDSS/2.5m_checklist_2.html -- 8.3 Кб -- 25.09.1999
Похожие документы

2624. default
. M1 Whiffle Mount and M1 Back, September 21, 1999 . Review of the M1 whiffle mounts continues. Photos at right and below taken by Steward Labs. The balance of Steward Lab photos can be obtained from ftp://ftp.apo.nmsu.edu/pub/images/miller . These two photos were taken by Dan Long. They are closeupsof the backside of M1 hex cell.
[ Сохраненная копия ]  Ссылки http://www.apo.nmsu.edu/Telescopes/ARCprogress/092199M1whiffle/default.htm -- 2.4 Кб -- 24.09.1999
Похожие документы

2625. default.htm
. M2 Whiffle Assembly with Peizo and Radiation Shield: September 17, 1999 . General work continues on the 3.5m M2 whiffle assembly with piezos, plus a look at the M2 radiation shield. The point of interest is the white luminiescent spots in the photos. RTV has been applied to the piezo. The new radiation shield for the M2 is shown below. In the closeup, spacers are shown between the mirror mount and the radiation shield.
[ Сохраненная копия ]  Ссылки http://www.apo.nmsu.edu/Telescopes/ARCprogress/091799piez/default.htm -- 2.5 Кб -- 20.09.1999
Похожие документы

2626. default
Construction Cover Frame: September 14, 1999 . Currently being served up at Chez French is the assembly of the framing for the cover to the telescope to be used during construction. ... These photos show 1/3 of the framing assembled. ... The frame is attached to the enclosure rail ties when the enclosure is OFF the telescope. ... The balance of the framing is shown as well as the attachment hardware. Photos of the complete frame will be made available upon assembly. ...
[ Сохраненная копия ]  Ссылки http://www.apo.nmsu.edu/Telescopes/SDSS/construction/091499cover/default.htm -- 3.4 Кб -- 14.09.1999
Похожие документы

2627. default
. Primary Mirror Hex-cell Deterioration: September 14, 1999 . During shutdown activities, inspections revealed deteriorating points on a M1 hex-cell. The following are pictures of the condition; the black circles identify the particular areas. The bracket is glued at four points in the hex cell; these two photos indicate position. The cell photo indicates the two areas. Closeups of the two fractures.
[ Сохраненная копия ]  Ссылки http://www.apo.nmsu.edu/Telescopes/ARCprogress/091499m1crk/default.htm -- 2.8 Кб -- 14.09.1999
Похожие документы

2628. default
. Work completed on refurbish and repair of temperature sensors Sept. 10, 1999. Shown ar right, area where temperature sensor has been chemically removed. Repair of divot. Application of new temperature sensor. Old temperature sensor.
[ Сохраненная копия ]  Ссылки http://www.apo.nmsu.edu/Telescopes/ARCprogress/091099temp/default.htm -- 2.3 Кб -- 10.09.1999
Похожие документы

2629. default
. M1 support system work completed Sept. 10, 1999 .
[ Сохраненная копия ]  Ссылки http://www.apo.nmsu.edu/Telescopes/ARCprogress/091099pms/default.htm -- 1.9 Кб -- 10.09.1999
Похожие документы

2630. default
. Maintenance completed on M1 during shutdown: Sept. 9, 1999. Bellofram work. New telescope mount for auto collimator and Shack-Hartmann. New close switch for mirror covers with access hole and notches .
[ Сохраненная копия ]  Ссылки http://www.apo.nmsu.edu/Telescopes/ARCprogress/091099m1/default.htm -- 2.7 Кб -- 10.09.1999
Похожие документы

2631. default
. Whiffle installed on M2, with closeup, Sept. 10, 1999 .
[ Сохраненная копия ]  Ссылки http://www.apo.nmsu.edu/Telescopes/ARCprogress/091099m2/default.htm -- 1.7 Кб -- 10.09.1999
Похожие документы

2632. default
. Flatfield Screen Operation Test: September 9, 1999 . The following sequence of photos is the flatfield screen opening and closing. Photos of one of the flatfield lamp assemblies (no lamps are active at the time), as well as the computer control panel on the side of the wind screen.
[ Сохраненная копия ]  Ссылки http://www.apo.nmsu.edu/Site/SDSS.progress/090999FF/default.htm -- 2.4 Кб -- 10.09.1999
Похожие документы

2633. default
In-Progress Roof Inspection: September 2, 1999 . Mark Klaene and Mike Evans met with M3, Basin Pipe and Metal and Gentry Const. (at Basin Pipe and Metal) to review the in-progress work on the enclosure roof. Basin Pipe and Metal (located in the Tularosa Basin) is the site of the meeting. ... The large bird in the lower left photo (background) is NM's Roadrunner (media: metal scrap) and the sqwiggly-haired form in the lower right photo (background) is Kokopelli (medi: scrap metal). ...
[ Сохраненная копия ]  Ссылки http://www.apo.nmsu.edu/Telescopes/SDSS/construction/090299roof/default.htm -- 3.4 Кб -- 03.09.1999
Похожие документы

2634. default
. Delivery of Cartridges 3, 4, 5: September 1, 1999 . Roberts Express delivered cartridges 3, 4, and 5 from UW to APO on Wednesday, Sept. 1, 1999. On September 2 the cartridges were moved to the Support Building.
[ Сохраненная копия ]  Ссылки http://www.apo.nmsu.edu/Site/SDSS.progress/090299carts/default.htm -- 2.0 Кб -- 02.09.1999
Похожие документы

2635. default
HVAC Duct Work and Completion of Platform Destruction: Sept. ... Basin Pipe and Metal completed the destruction of the enclosure platform with nice results . ... These are various views of duct work on the lower level-west end. ... Top left-view of the duct work on lower level passing out the building to the utility breezeway. The other two views are of duct work on the lower level-east end. Duct work pass throughs on east end of lower level. ...
[ Сохраненная копия ]  Ссылки http://www.apo.nmsu.edu/Telescopes/SDSS/construction/090199plathvac/default.htm -- 4.3 Кб -- 01.09.1999
Похожие документы

2636. default
Platform Destruction: August 30, 1999 . Basin Pipe and Metal (subcontractors) were on site today to destruct the enclosure platform and begin drilling mounting holes. ... The enclosure is rolled off the telescope for the day in preparation of the platform and HVAC work. ... The pilot holes are drilled but work is deferred to Aug. 31 when the bracket arrives. Work then begins on the enclosure platform destruction. (argh, argh, argh) . More destruction! (the cylinder is CO2) . ...
[ Сохраненная копия ]  Ссылки http://www.apo.nmsu.edu/Telescopes/SDSS/construction/083099Plat/default.htm -- 4.0 Кб -- 31.08.1999
Похожие документы

2637. Plug-plate hole tilt
... The tilt of the holes was compared to that of the telecentric surface of the contemporaneous spectrographic optical design, kent005. ... The tilt of each hole as a function of its radial location on the plate is plotted along with the ideal tilt from optical design kmg001 (Figures 2 through 7). ... Figure 2: Hole tilts for uw0100. ... Measurements of the tilts of holes in plates drilled in December of 1994 have been reanalyzed and compared to the ideal hole tilt of the current optical design kmg001....
[ Сохраненная копия ]  Ссылки http://www.apo.nmsu.edu/Telescopes/SDSS/eng.papers/19990622_PP_HoleTilt/19990622.html -- 13.1 Кб -- 31.08.1999
Похожие документы

2638. catinstall
CATWALK INSTALLATION: AUGUST 18, 1999 . The catwalk is being installed to provide access to the soon-to-be new HVAC/environmental infrastructure. Aug. 17: the preparation for the installation of the new catwalk included cutting the tiedowns for the pier grating and providing support straps for the utility pipe. ... The crew from Basin Pipe and Metal (local Alamogordo business) sets up the safety barrels around the work area and begins to offload the catwalk. ...
[ Сохраненная копия ]  Ссылки http://www.apo.nmsu.edu/Telescopes/SDSS/construction/catwalk/catinstall.htm -- 4.3 Кб -- 19.08.1999
Похожие документы

2639. begin
. CATWALK CONSTRUCTION START: AUG. 8, 1999 . The "important" construction equipment was delivered last week. Crew should be on site by Wed. 8/11.
[ Сохраненная копия ]  Ссылки http://www.apo.nmsu.edu/Telescopes/SDSS/construction/begin/begin.htm -- 1.6 Кб -- 09.08.1999
Похожие документы

2640. camremv
Moving the Mosaic Camera to the Clean Room: July 21, 1999 . An attentive crew helped move the mosaic camera into the clean room for scheduled work. ... The camera is removed from the telescope and prepared for lifting into the pickup truck and motored to the loading dock at the Ops. ... The camera is on board the truck and French (ever so gently) moved the truck to the loading dock. ... The camera is safely brought inside, and is now stowed in the Clean Room. ...
[ Сохраненная копия ]  Ссылки http://www.apo.nmsu.edu/Site/SDSS.progress/camrmv799/camrmv.htm -- 3.4 Кб -- 21.07.1999
Похожие документы

В начало ] Пред. | 128 | 129 | 130 | 131 | 132 | 133 | 134 | 135 | 136 | 137 | След.В конец ]

Rambler's Top100 RFBR Яндекс цитирования